Bored wells are constructed by means of an auger which bores a cylindrical hole into the earth. After water is reached, soil samples are collected to determine the permeability of the soil. If a suitable permeable soil is encountered, a screen or filtering device is attached to a casing and lowered into the bore hole. The casing is driven or pushed to the desired depth. The well is developed, and water is extracted from the soil.